Certifié aux normes :ISO certified: ISO 9001 | ISO 14001 | ISO 45001
● HV Substation Construction in Africa
Construction of HV/MV/LV Electrical Substations in Benin & Africa
HV Substation Construction in Africa: civil works, equipment installation and commissioning for utilities, States and donor-funded energy projects. Explore our services, see our completed projects or request a quote.
Construction and maintenance of HV/MV/LV substations up to 400 kV — a rare and recognised expertise in Africa.
High-Voltage Expertise in Africa
HV/MV/LV substations from 15 kV to 400 kV
BESCAT has one of the few qualified teams in West Africa able to work on electrical structures up to 400 kV. We took part in the CIPREL 5 and AZITO 4 projects in Côte d'Ivoire in partnership with EDF and VINCI.
Our team masters every stage: protection studies, supply and installation of equipment, commissioning and preventive maintenance of HV/MV/LV substations. Every intervention complies with the IEC, NF and RTE standards in force.
mastered (HV)
in Benin, Côte d'Ivoire and Senegal
partner
in HV energy
OUR FIELDS
HV Substation Construction in Africa — Our 6 Electrical Substation Services in Africa
From design to commissioning, we master the entire life cycle of HV structures.
TECHNICAL & EXPERTISE
Technical FAQ — HV/MV/LV Substations in Africa
Everything you need to know about our high-voltage substation capabilities.
BESCAT GROUP works at all voltage levels used in Africa, from medium to extra-high voltage. We build 15 kV, 20 kV and 33 kV MV substations, 90 kV and 225 kV HV substations, as well as 400 kV structures for large-capacity power evacuation networks. Each voltage level requires specific engineering, certified equipment and authorised teams. Our participation in the CIPREL 5 and AZITO 4 projects in Côte d'Ivoire illustrates our ability to work on the most demanding HV structures in sub-Saharan Africa.
BESCAT GROUP works across the whole of Africa on electrical substation and high-voltage network projects. Our teams are deployed in Benin (Cotonou, Porto-Novo, Parakou), Côte d'Ivoire (Abidjan and the interior), Senegal (Dakar and industrial zones) and Guinea-Conakry. We work with local network operators — SBEE in Benin, CI ÉNERGIE and CIE in Côte d'Ivoire — respecting their lockout procedures, technical standards and specific protection plans. We can mobilise in a new country in less than 30 days.
Yes, absolutely. Our high-voltage engineering office can carry out protection studies completely independently, without you entrusting us with the works. This service is aimed at clients, engineering firms and construction companies that need an expert technical view of their MV or HV protection plan. We deliver: short-circuit current calculation notes (IEC 60909 standard), protection relay settings, the protection functional diagram and the selectivity plan. Our deliverables can be used directly by commissioning teams and approved by the network operator.
The construction time of an electrical substation depends on several factors: voltage level, size of the structure, complexity of the equipment and equipment delivery lead times (transformers, switchgear).
As a general rule, for a standard 15/0.4 kV MV substation (1 to 2 transformers), allow 4 to 8 weeks of works after mobilisation. For a 90 kV or 225 kV HV substation, the delivery time ranges from 3 to 9 months depending on the configuration. BESCAT GROUP draws up a detailed schedule with weekly milestones from the study phase.
We meet contractual deadlines through rigorous procurement management and close coordination with approved equipment suppliers.
Yes. All our technicians and engineers working on live networks hold the electrical authorisations required by network operators (SBEE, CI ÉNERGIE, SENELEC) and compliant with NF C 18-510 and IEC 60900 standards.
Our teams are trained in live-line work (LLW) on MV networks up to 33 kV, in lockout/tagout of HV structures, and in working procedures in the enhanced proximity zone.
Each site on a live network is subject to a prior risk analysis, a prevention plan validated with the operator and a daily safety briefing for all personnel.
● HV PROJECT?
Entrust Your HV/MV/LV Substation Project to BESCAT GROUP
Our technical team analyses your needs and proposes
a suitable solution.